Our library contains : 

Skaggerack vessel
The Skaggerack (operated by Nexans) will be laying the subsea export cables from the site to the landfall point near Portgordon.
Piling milestone
The 700 tonne Pile Installation Frame (PIF) being pulled from the sea after completion of the installation of the first set of four foundation piles.
The Siem Aimery
The Siem Aimery vessel will be undertaking subsea inter-array cable laying duties during the construction phase.
The Stanislav Yudin
The Stanislav Yudin is a heavy lift vessel which is tasked with installing pile foundations at each of the turbine and OTM locations.
Stanislav Yudin at Invergordon
Another image of the SY, clearly showing the 700t Pile Installation Frame on deck and the hammer in the foreground.
Blackhillock construction
Taken in April 2017, this image shows construction at our substation and the beginning of installation of the main infrastructure.
Unloading foundation piles
These images show the second set of foundation piles being unloaded from the barge alongside the Stanislav Yudin.
Wick harbour
Wick Harbour will be the location of our long term Operations and Maintenance Base.
Steel cutting at BiFab
The steel arrives in plates which must be cut to the correct sizes before being turned into foundation piles or parts of the 'jackets'.
Show More